Step 1

- Clean and prepare the loading area

- Lay out the tie downs

- Hook tie downs into the anchor points

Step 2

- Roll bike into position

Step 3

- Install Cycle Cynch loop over each handlebar

- Cross strap facing up, D-Rings facing down

- Loop with label goes on the left

- Loop with buckle goes on the right

- Leave slack in the cross strap

Step 4

- Hook tie down through the D-ring on the left loop

- Pull tie down taut

STEP 5

- Hook tie down through the D-ring on the right loop

- Pull tie down taut until the motorcycle stand upright*

*Due to variances in makes, models, and anchoring systems a secure tie down can only be self-determined

Step 6

- Remove the slack on the cross strap, so that the strap is snug

- No tension is needed on the cross strap

- Loops should lay flat across each handlebar

- Be sure to lift your side stand. DO NOT leave it in the downward position

- Tie off excess slack on tie downs

Tips

- Cycle Cynch is not recommended for long-term storage use, never store your bike with the suspension compressed

- Tie off the rear of the motorcycle using the Cycle Cynch Rear to keep the back side from moving around in your trailer or truck bed

- Cycle Cynch can be used on scooters and bicycles too (basically, anything with handlebars)